Alley West of Langley Avenue Sewer Improvement Project

  • Alley West of Langley Avenue Sewer Improvement Project
  • Alley West of Langley Avenue Sewer Improvement Project

Overview

Client: Chicago Department of Water Management

Location: Chicago, IL

Description

The existing sewer dated back to 1880 and needed to be replaced. The area bounded by 106th Street on the north, 108th Street on the south, Langley on the east and Champlain on the west will benefit from improved drainage and reduced risk of flooding. 

Thprojecconsisted oapproximately 1,490’ osewer with sizeranging fro15” to 42” diameter sewer pipe installation along with the installation of ADA ramps and pavement restoration within the project limits. 

The project limits are: Alley West of S. Langley Avenue from E. 108th Street to E. 106th Street and E.107th Street froSLangley Avenuto the Alley WesoSLangley Avenue 

Services Provided

To accomplish the requirements of each project, d’Escoto, Inc. provided the Resident Engineer that performed the following services:

  • Manage and organize field inspection needs
  • Perform site inspections and assist the inspector with fieldwork as needed
  • Review and check the daily report with a measurement sheet
  • Assist the contractor with utility coordination
  • Coordinate with other agencies and city departments
  • Prepare a break report if a utility is hit.  Coordinate with that utility for repair
  • Prepare paperwork such as PCMs, LICs, field orders, ADA ramp QC reports
  • Prepare the monthly estimate
  • Address concerns by the public.